Memorial Stadium South Expansion

University of Missouri

Columbia, MO
Memorial Stadium South Expansion University of Missouri

Emery Sapp & Sons was approached by M.A. Mortenson, the Construction Manager at Risk to partner on the South End Zone Expansion of Memorial Stadium at the University of Missouri in Columbia, MO. This project involved a highly accelerated bid to build timeline. To get the groundwork underway for the construction, ESS was awarded the site grading and underground utility package.

Owner University of Missouri

General Contractor M.A. Mortenson Company

Civil Engineer SK Design Group, Inc.

ESS Role Subcontractor

Project Duration 7 months

Self-Performed 90%

Scope of Work

Of the 45,000 cubic yards of excavation required to open-up the new building footprint, over 14,000 cubic yards was solid rock that had to be mechanically broken due to its proximity to the existing stadium. A 30-foot-deep box culvert was removed and a new one constructed to tie the south end of the existing field to the future building. An engineered slide rail shoring system and multiple trench boxes were utilized to complete this work while preserving the integrity of the football field. Over 2,100 cubic yards of solid rock was mechanically broken and removed from the nearly 7,000 linear feet of utility trench. All the pipe trenches were required to be backfilled in entirety with base rock due to the rocky condition of the existing soils. In addition to soil mitigation issues, ESS installed a 6’x4′ box culvert, 760 linear feet of dual 14″ chilled waterline, 8,000 square yards of 24″ aggregate base building pad, 14,000 square yards of 6″-10″ base rock for paving areas, and 10,000+ square feet of modular block retaining walls.

Storm Sewer 2,800 LF, 20 structures

Sanitary Sewer 1,260 LF, 11 structures

Water Line 1,200 LF of 6" and 8"

Excavation & Grading 45,000 CY