The Lepanto North Substation located in Lepanto, AR was a new substation for the area that resided in close proximity to the New Madrid Fault Line.

Owner Re-Con Construction Co

ESS Role General Contractor

Project Duration 1 Month

Self-Performed 85%

Scope of Work

Due to the location of this job it required a unique strategy to complete. To ensure minimal movement of the structures in the event of an earthquake, ESS installed 400 cubic yards of compacted base rock under all the footings and pads and utilized 33.7 tons of rebar.

Drilled Piers 423 CY