John Twitty Energy Center

Rail Loop Extension

Springfield, MO
John Twitty Energy Center Rail Loop Extension

Emery Sapp & Sons were contracted for the construction of a track embankment and sub-ballast, in preparation for the expansion of City Utilities existing rail-served loop track offloading facility.

Owner City Utilities of Springfield

Civil Engineer Olsson Associates

ESS Role General Contractor

Project Duration 5 months

Self-Performed 85%

Scope of Work

This project consisted of clearing 4.06 acres, excavating 15,329 cubic yards, and building 4,380 cubic yards embankment and 7,230 cubic yards sub-ballast required for the preparation of the track. In conjunction with the track embankment, containment embankments were also built.

Excavation & Grading 15,329 CY

Embankment 4,380 CY