Partnering with Olsson, the Emery Sapp & Sons (ESS) Design-Build team provided multiple improvements to enhance the connectivity in an 80-year-old residential neighborhood between Orchard and Douglas Street on the west and Independence Avenue on the east. The project included the engineering analysis, design, and construction of multiple improvements within the neighborhood.
ESS contributed to the installation of concrete curb and gutter plus sidewalks. ESS also provided stormwater improvements, utility relocations, and utility coordination; including locates and deconfliction, field surveys, and as-built surveys and drawings.
Grading & Excavation
10,025 CY
Underground Utilities
5,744 LF
Sanitary Sewer
150 LF
Storm Water
2,922 LF
Water Line
2,672 LF
Concrete Paving
2,575 SY
StatusEstado: Completed
Last Updated onUltima actualización en July 24, 2023