Joplin High School

  • Demolition and Cleanup 30.00 AC
  • Stockpile on site Topsoil 17,171 CY
  • On Site Excavation 227,784 CY
  • Mine Shaft Closures 11 EA
  • Storm Pipe 14,197 LF
  • Sanitary Pipe 4,843 LF
  • Water Piping 3,939 LF
  • Box Culvert 841 LF
  • Articulating Block 10,373 SF
  • Trench Drains 792 LF
  • PDF

 


Project Category


Duration: Aug. 01, 2012 – Aug. 31, 2014