NE Orchard Street Design-Build

Lee's Summit, MO
NE Orchard Street Design-Build

Partnering with Olsson Associates, our Design-Build team provided multiple improvements to enhance the connectivity in an 80-year-old residential neighborhood between Orchard and Douglas Street on the West and Independence Avenue on the East. The project included the engineering analysis, design, and construction of multiple improvements within the neighborhood.

Owner City of Lee's Summit, MO

Civil Engineer Olsson Associates

ESS Role General Contractor

Project Duration 9 months

Self-Performed 90%

Awards 2016 DBIA Project Award - Civil Infrastructure

Scope of Work

ESS contributed to the installation of concrete curb and gutter plus sidewalks. ESS also provided stormwater improvements, utility relocations, utility coordination; including locates and de-confliction, field surveys and As-built surveys and drawings.

Storm Sewer 2,922 LF, 41 structures

Sanitary Sewer 150 LF

Water Line 2,672 LF, 28 structures

Concrete 2,575 SY

Sidewalk 33,383 SF

Curb & Gutter 9,023 LF

Excavation & Grading 10,025 CY